BRAND ATELIER
Veltrix Industrial — Exhibition stand — Trade fair

Trade fairs / Print

Veltrix Industrial

Exhibition stand — Trade fair

Client

Veltrix Industrial

Industry

Trade fair

Location

International trade fair

Year

2025

01

Challenge

Veltrix needed to stand out on a hall floor of near-identical industrial exhibitors, on a build schedule of under 48 hours.

02

Approach

We designed a stand around scale and material rather than screens and banners — a raised timber-and-steel volume visible from across the hall, with graphics produced to survive three days of handling.

03

Execution

Modular structure, trade fair graphics and lighting were pre-built and tested off-site, then assembled on the floor in 36 hours with a dedicated install crew.

Veltrix Industrial — detail 1
Veltrix Industrial — detail 2
Veltrix Industrial — detail 3

Result

The most-photographed stand in its hall, and a modular structure Veltrix now reuses across three fairs a year.

Solheim — Pop-up activation — Launch event

Next project

Solheim

Pop-up activation — Launch event

View project